Can the space support the intended use?
Review available utility information, existing systems and the proposed occupancy. Identify where a site assessment or additional records are needed.
Mechanical, electrical and plumbing systems influence each other. SRI Global brings these disciplines together to help architects, contractors and owners plan commercial spaces with a clear engineering scope.
A new tenant, a different kitchen lineup or additional equipment can change the demand on existing building systems. Early review helps your team identify what needs to be checked before design and construction advance.
Review available utility information, existing systems and the proposed occupancy. Identify where a site assessment or additional records are needed.
Compare electrical demand, ventilation, water and drainage requirements before accepting equipment selections or substitutions.
Review equipment schedules, service connections, routing and access together with the architectural layout.
We define the required disciplines, calculations and deliverables with your team before work begins.
Plan heating, cooling and airflow around the building use and equipment requirements.
Evaluate electrical demand and coordinate the supply to building equipment and lighting.
Coordinate plumbing systems with fixture needs, equipment and available utility information.
CAD or Revit/BIM deliverables, coordination reviews and permit-response support are defined in the agreed scope.
Discuss your proposed use, location and equipment with us. We will review the engineering needs and confirm whether the project fits our team's capabilities and availability.
SRI Global's MEP offering is supported by engineering professionals with relevant individual experience. We bring the required disciplines together around an agreed scope, defined responsibilities and coordinated design reviews.
For your project, we can discuss the proposed team, each discipline's role and the individual experience relevant to the work.
Talk with us about your engineering needs →A space that looks ready may still need system changes. Use these questions to start the conversation with your landlord, architect and engineering team.
Compare available service information with the planned equipment loads. Empty breaker spaces alone do not establish available capacity.
Consider occupancy, floor-plan changes, ventilation and heat-producing equipment when reviewing the existing system.
Check proposed fixtures, hot-water demand, equipment connections and any special waste requirements.
Investigate routing, outdoor discharge locations, roof or wall access and landlord restrictions early.
Identify permit steps, utility coordination, landlord approvals and potential equipment or service upgrades.
This checklist supports early planning. Project requirements depend on the site, proposed use and applicable local requirements.
Establish the design basis and review points before moving into detailed engineering.
Review the location, proposed use, available drawings, equipment information and target milestones.
Prepare the agreed calculations, layouts and schedules. Track missing inputs and coordinate discipline interfaces.
Check consistency with architectural information, equipment selections and the agreed design basis.
Deliver the agreed documents and provide permit-comment or construction clarification support within the scope.
Permit needs depend on the jurisdiction, building use and scope of work. We identify the applicable design criteria and documentation needs as part of project planning.
Calculations, energy compliance documentation and responses to review comments can be included in the engineering scope. Permit approval and review timing remain with the reviewing authorities.
Send the project address, intended use, available floor plans, major equipment information and target dates. If drawings are incomplete, tell us what is available so we can identify the next steps.
Yes. Coordination with your project team can be included in the scope, with agreed information exchanges, review points and responsibilities.
We propose a schedule after reviewing the scope, available inputs and team availability. Site information, equipment selections, client decisions and required review cycles affect the timeline.
Depending on the agreed scope, deliverables may include calculations, drawings, equipment schedules and permit-support documentation. We confirm PDF, CAD and Revit/BIM requirements before starting.
Share the project location with us. We confirm service availability, professional licensing requirements and the proposed team before accepting the assignment.
Yes. We can discuss the proposed professionals, their roles and their relevant individual experience. Experience gained by team members at other firms is identified as individual experience.
Share your location, proposed use and target schedule. Let's define the engineering scope and the information needed to move forward.